A replacement project can promise faster or more capable equipment while saying little about how service will continue when something goes wrong. Resilience requires a different question: which failure can the system absorb without a much larger disruption? What kind of test or published performance measure would make that promise credible? Discuss the standard the public should expect rather than proposing technical instructions for interfering with a live aviation system. Factual context — 2026-11-18 (source checked November 24, 2026): AP reported investigators were examining a newly installed router after the nationwide ground stop.
Politics
FAA ground stop investigation: Should infrastructure modernization be judged by resilience as well as speed?
2 replies