A pipeline can include projects at very different stages. Counting every proposed dwelling as though it were available to live in can make a delivery claim impossible to evaluate. What should a public housing report show about approvals, construction and completion? Consider a comparison that would reveal a delay or bottleneck without assuming that a single institution controls the entire process or that increasing one stage guarantees an equivalent increase at every later stage. Factual context — 2026-11-14 (source checked November 24, 2026): ABC examined the political choices around cheaper housing in a November analysis.